High Voltage Power

66kV Power Transformer

Sub-transmission power transformer for industrial main supply, city substations, and regional distribution. OLTC, built to IEC 60076.

6.3–100 MVACapacity
66 kVVoltage
IEC 60076Standard
66kV Power Transformer

Technical Parameters

Standard parameter ranges for this model. Special requirements can be assessed by our engineering team — contact us for custom specifications.

ParameterStandard Range
Rated capacity6.3–100 MVA (typical: 10/16/20/31.5/40/50/63/80/100)
Primary voltage66 kV (max 72.5 kV)
Secondary voltage10, 11, 35 kV / custom
Frequency50 Hz or 60 Hz
Phase3-phase
Vector groupYNd11, YNd1 (custom)
Impedance9% – 13% (per spec)
Cooling methodONAN / ONAF
Tap changerOn-load (OLTC) ±8×1.25%
Insulation levelLI325AC140 (66kV)
Temperature rise65K (oil); 65K (winding)
No-load lossPer IEC 60076 / customer spec
Load lossPer IEC 60076 / customer spec
Noise level≤65 dB (per IEC 60076-10)
Protection levelIP00 indoor; IP54 outdoor
Applicable standardsIEC 60076, IEEE C57.12.00
Ambient temperature-25°C to +40°C
Altitude≤1000m (derating above)
AccessoriesOLTC, Buchholz, temp gauges, pressure relief, control cubicle
Special parameters (non-standard voltage, capacity, impedance, or environmental conditions) can be assessed by our engineers. Response within 12 hours, full proposal within 48 hours.

Product Advantages

Verifiable benefits — not empty claims. Here’s exactly what you get when you choose JINXING.

🧪

Full Routine Test

IEC 60076-1 routine tests on every unit.

⏱️

Fast Response

48h standard quote; 3–5 days custom.

📄

English Docs

Complete documentation in English.

👁️

Witness FAT

Third-party witness testing available.

🏭

OEM Support

Custom branding and private label.

🔧

OLTC Standard

On-load tap changer included as standard.

66kV transformer bushings, cooling system and terminal details

Applications

Where this transformer is used — connecting the product to real-world industry applications.

Sub-transmission

66kV regional distribution substations.

🏭

Industrial

Factory main supply — 66/10kV step-down.

🏙️

City Substation

Urban distribution — 66kV to 10kV.

☀️

Renewable

Solar/wind farm collection — 66kV.

Quality Proof — 9-Step Manufacturing Process

Every transformer passes through 9 quality-controlled stages, from raw material to shipping. Full traceability with documentation at every step.

66kV transformer winding, assembly and high-voltage testing process
1

Material Inspection

Raw material verification — core steel, copper, oil, accessories checked against certificates before production.

2

Core Cutting

CNC step-lap core cutting for low-loss grain-oriented silicon steel. Core loss measured before assembly.

3

Winding

Controlled winding tension, turn-count verification, and insulation paper application for each coil.

4

Assembly

Core-coil assembly with dimensional checks for fit, clearance, and clamping force.

5

Vacuum Drying

High-vacuum drying ovens remove moisture from insulation before oil impregnation.

6

Oil Filling

Filtered insulating oil with breakdown voltage >70kV/2.5mm and moisture <10ppm.

7

Final Testing

Full routine test per IEC 60076-1 — insulation, resistance, ratio, losses, withstand.

8

Packing

Sea-worthy export packing with shock-fixed crating for ocean shipping.

9

Shipping

On-time delivery with documentation — test reports, drawings, manuals in English.

Need a Custom Transformer Solution?

Our engineering team can assess non-standard voltage, capacity, impedance, or environmental conditions — and deliver a full proposal within 48 hours.

Leave a Reply

Your email address will not be published. Required fields are marked *

Scroll to Top