Power transformers under manufacture in the JINXING factory workshop JINXING POWER · REAL MANUFACTURING
Custom Transformer Manufacturer

Transformers engineered for real project conditions

Power, distribution, renewable-energy and industrial transformers—configured to your electrical duty, site environment and delivery scope, with engineering support from specification to shipment.

20+ YearsTransformer manufacturing experience
50–400 MVADistribution through grid applications
IEC / IEEEProject standards and documentation
30+ MarketsInternational project delivery
20+Years Manufacturing
50,000㎡Factory Area
400 MVAMax Capacity
30+Countries Shipped
Case Studies

Real projects, real parameters

Representative projects with actual specifications and verified results.

ENGINEERING + MANUFACTURING NETWORK

Understand the manufacturing network behind your transformer

JINXING coordinates application engineering, export communication and delivery with long-term transformer manufacturing partners. Review the production, testing and project scope before sending a specification.

35–220kVProduct voltage range
Custom / OEMEngineering scope
IEC / IEEEProject standards
FAT WelcomeWitness inspection
Aerial view of a JINXING transformer manufacturing network campus

From Raw Material to Shipping — One Continuous Flow

Eight manufacturing stages, one factory — see how JINXING transforms silicon steel and copper into tested, packaged transformers ready for export.

JINXING transformer manufacturing process - 8 stage panorama from raw material to shipping
☀️

50 MW Solar Plant — Step-up Substation

Level 4 · Complete Substation

Customer: EPC contractor, desert PV plant

Solution: 1×2500kVA 35/0.8kV box substation, IP54, harmonic-tolerant, multi-winding

Result: On-time delivery, grid-accepted, stable operation

🖥️

Data Center — Dry-type Transformer

Level 1 · Transformer Only

Customer: Data center operator, fire-safe requirement

Solution: Cast resin dry-type, Class F, ≤55dB, PD monitoring

Result: Compliant with fire safety, reliable 24/7

🌍

East Africa — Distribution Transformers

Level 1 · Transformer Only

Customer: Utility/EPC, rural electrification

Solution: 11/33kV oil-immersed, pole-mounted, KPLC spec

Result: Multiple repeat orders, reliable performance

CCTV NEWS REPORT
MAJOR RENEWABLE ENERGY PROJECT

China Green Development Ruoqiang 4 GW Photovoltaic Project

JINXING participated in this major renewable-energy project. CCTV’s Morning News reported its successful grid connection, demonstrating the scale and national significance of the development.

4 GWPhotovoltaic project capacity
Grid connectedReported by CCTV Morning News
Open Full-screen Video →

CCTV footage is shown for project-news reference. The report covers the project; it is not an endorsement of JINXING.

Send us your specifications

Initial technical response within 12 hours. Standard quotes in 48h, custom solutions in 3–5 days.

Scroll to Top