

Engineering confidence into every transformer project
From technical clarification to manufacturing, testing and export delivery, JINXING gives utility, industrial and renewable-energy customers one clear route from specification to site.

A project partner with engineering at the centre
A transformer is never just a catalogue item. Voltage system, loading profile, losses, impedance, environment, interfaces and the applicable standard all influence the right configuration. Our team turns those requirements into a controlled technical and delivery scope.
- 01Project-specific engineeringRatings, losses, impedance, accessories and interfaces are confirmed for each order.
- 02Flexible supply scopeTransformer only, compact substation, skid or coordinated equipment package.
- 03Export-ready coordinationEnglish drawings, reports, packing documents and responsive technical communication.
Production capability you can see
Approved technical requirements remain connected to material control, assembly checkpoints, testing and final documentation.


From requirement to delivery
Each project follows a practical sequence with clear technical decisions and documented release points.
Designed for local networks and site conditions
We confirm the applicable standard, grid parameters, climate, altitude, corrosion level and documentation requirements before the final configuration is released.
Bring us your transformer specification
Send the rated power, voltage, frequency, vector group, impedance, standard and site conditions.