QUALITY ASSURANCE

Quality Control

Quality control at JINXING spans the entire production lifecycle — from incoming material inspection to final pre-shipment verification. Every transformer is traceable from raw material to delivery.

QC Checkpoints Throughout Production

1Incoming Material
2Core Cutting
3Winding
4Assembly
5Drying
6Oil Filling
7Final Test
8Pre-Ship

Incoming Material Inspection

Core Steel

Verification of grain orientation, thickness, and specific loss values per certificate before cutting.

Copper Conductors

Dimensional inspection, resistance measurement, and insulation paper quality check.

Insulating Oil

Breakdown voltage, moisture content, and dielectric loss testing on every oil batch.

Accessories

Function testing of OLTC, Buchholz relay, temperature controllers, and other components.

In-Process Quality Control

Core Geometry

Step-lap joint verification, core loss measurement before and after assembly.

Winding Tension

Controlled winding tension and turn-count verification for each coil.

Insulation

Insulation resistance check after drying and before oil impregnation.

Assembly Tolerance

Dimensional checks for core-coil assembly fit, clearance, and clamping force.

Final Quality Documentation

Test Reports

Full routine test report with every unit — in English, with measured values and pass criteria.

Nameplate

Verified nameplate with all rated data, serial number, and manufacturing date.

Material Certificates

Available on request — core steel, copper, oil, and accessory certificates.

Traceability

Each unit has a unique serial number traceable to all material batches and test records.

Quality built into each stage
CONNECTED SUPPORT

Quality built into each stage

Inspection points cover incoming materials, winding and core dimensions, assembly, drying, final testing, documentation and packing.

Want to learn more about our QC process?

Contact us for our detailed quality control procedures, or arrange a factory audit and witnessed inspection.

Contact Us →

Scroll to Top