Containerized Power System

Containerized Power System

Contact us for best pricing

Rapid deployment containerized power systems in standard ISO containers. Complete integration of BESS, inverters, switchgear, and control rooms. Factory-tested and pre-commissioned for instant operation on site.

MOQ: 1 Set Small batch trial supported
Lead Time: 4-8 Weeks After deposit confirmed
T/T, L/C Accepted Flexible payment terms

Ready to Get Started?

Contact us today for a customized quote and professional technical support.

Contact Now Request Quote

Response within 24 hours

Why Choose Jinxing Power

From Order to Delivery — Our Process

A transparent 6-step workflow, backed by certified quality and 15+ years of manufacturing expertise.

28,000 m²

Factory Area

12,000+ Units

Annual Capacity

CE / ISO9001

Certified

1 Set MOQ

4–8 Weeks Delivery

1

Order Confirmation

Technical docs & delivery confirmed within 2 working days

2

Engineering

Drawings issued for your approval before production starts

3

Manufacturing

Core winding, assembly & oil filling per strict process

4

Quality Testing

24+ performance tests, all reports archived for traceability

5

Packaging & Loading

Seaworthy wooden cases, FOB/CIF/DDP all supported

6

Shipping

BL, CI, PI, CO provided — smooth customs clearance

Quality Tests Performed

Every unit, before shipment

No-load & Load Loss
Temperature Rise
Insulation Resistance
Short-Circuit Withstand
Noise Level Measurement
Lightning Impulse Test

Compliance Standards

IEC & GB certified quality

IEC 60076

Power Transformers

GB 1094

National Standard

CE Certified

EU Compliance

Proven Track Record

Related Application Cases

Real-world success stories from global clients across power, mining, and renewable energy projects.

KBSG Mining Transformers for Inner Mongolia Coal Mine

KBSG Mining Transformers for Inner Mongolia Coal Mine

A large coal mining operation required explosion-proof transformers certified to MA standards, capable of withstanding harsh underground conditions including methane gas and dust.

110kV Substation Upgrade in UAE Industrial Zone

110kV Substation Upgrade in UAE Industrial Zone

Aging 110kV substation in Dubai Industrial Zone needed complete transformer replacement during a 30-day planned outage window, with zero tolerance for delays due to grid stability requirements.

SCB18 Dry-type Transformers for Vietnam High-rise Project

SCB18 Dry-type Transformers for Vietnam High-rise Project

A premium residential complex in Ho Chi Minh City required fire-safe indoor transformers with extremely low noise (under 42dB) and green-building certification compliance.

Explore More

Related Products

Other transformer models that may suit your application.

Get Your Free Quotation in 24 Hours

Tell us about your project requirements. Our technical team will respond within 24 hours with a detailed quotation — including unit pricing, lead time, and shipping options. No obligation, no pressure.

Phone / WhatsApp
+86-16638201992
Email
sales@jinxingpower.com
Response Time
Within 24 Hours
Warranty
3-Year Warranty, Lifetime Maintenance

Quick Quote Request

Fill out a quick form and our team will respond within 24 hours with detailed pricing and lead times.



    Your information is kept strictly confidential.