Remote Amazon basin hydroelectric project required transformers transportable by river barge and assemblable on-site, with tropical climate tolerance and high humidity resistance.

Project Background & Challenge

Remote Amazon basin hydroelectric project required transformers transportable by river barge and assemblable on-site, with tropical climate tolerance and high humidity resistance.

Our Solution

We designed modular 25MVA transformers shipped in disassembled sections, with on-site assembly supervision and tropicalized insulation systems rated for 95% humidity operation.

Project Results

All 4 units assembled and commissioned on schedule. The plant has been generating 80MW reliably for 2 years, supporting 60,000 local homes with clean energy.

Challenge

Remote Amazon basin hydroelectric project required transformers transportable by river barge and assemblable on-site, with tropical climate tolerance and high humidity resistance.

Solution

We designed modular 25MVA transformers shipped in disassembled sections, with on-site assembly supervision and tropicalized insulation systems rated for 95% humidity operation.

Result

All 4 units assembled and commissioned on schedule. The plant has been generating 80MW reliably for 2 years, supporting 60,000 local homes with clean energy.