110kV Substation Upgrade in UAE Industrial Zone

110kV Substation Upgrade in UAE Industrial Zone

United Arab Emirates Power Grid 2026

Aging 110kV substation in Dubai Industrial Zone needed complete transformer replacement during a 30-day planned outage window, with zero tolerance for delays due to grid stability requirements.

Project Background & Challenge

Aging 110kV substation in Dubai Industrial Zone needed complete transformer replacement during a 30-day planned outage window, with zero tolerance for delays due to grid stability requirements.

Our Solution

We pre-manufactured 3 sets of 50MVA 110kV power transformers in our facility, shipped via dedicated air-freight, and deployed a 24/7 on-site installation team to meet the aggressive timeline.

Project Results

Project completed 2 days ahead of schedule. Substation capacity increased by 40%, and the client signed a 5-year maintenance contract with us for ongoing support.

Challenge

Aging 110kV substation in Dubai Industrial Zone needed complete transformer replacement during a 30-day planned outage window, with zero tolerance for delays due to grid stability requirements.

Solution

We pre-manufactured 3 sets of 50MVA 110kV power transformers in our facility, shipped via dedicated air-freight, and deployed a 24/7 on-site installation team to meet the aggressive timeline.

Result

Project completed 2 days ahead of schedule. Substation capacity increased by 40%, and the client signed a 5-year maintenance contract with us for ongoing support.

Related Products

Products Featured in This Project

Interested in Similar Solutions?

Contact our technical team to discuss your power transformer requirements. We provide customized solutions tailored to your specific environmental and operational needs.