APPLICATION

Diesel Generator Hybrid Retrofit

Retrofit existing diesel generators with solar PV and battery storage to cut fuel costs by 40-70%.

Request a Proposal

Transform Your Existing Gensets

Upgrade your diesel generator fleet with a hybrid retrofit solution that integrates solar panels and battery energy storage without replacing existing assets. Our retrofit kit works with all major generator brands and can be installed with minimal downtime. Typical results: 40-70% fuel reduction, 50-80% lower maintenance intervals, and 3-5 year payback period.

System Configuration

Generator CompatibilityAll major brands, 50kVA-2000kVA
Solar PV Addition50kWp – 2MWp
Battery Storage100kWh – 5MWh (LiFePO₄/Li-ion)
Control SystemPLC-based hybrid controller with remote SCADA
Installation Downtime2-5 days per unit
Fuel Savings40-70% vs diesel-only
Maintenance Reduction50-80% fewer service intervals
Warranty5 years on major components
50%

Average Fuel Saving

>500

Units Retrofitted

3-5yr

Payback Period

<1wk

Installation Time

Have a Retrofit Project?

Get a free feasibility study and savings estimate in 24 hours.

Contact Us

Retrofit Existing Diesel with Solar + Battery

You already have a diesel generator. Maybe several. They’re working, they’re paid for, and replacing them outright is wasteful. The good news: you don’t have to. A hybrid retrofit adds solar PV and battery storage alongside your existing diesel plant.

The diesel keeps running. The solar+battery just takes over a much larger share of the work. Fuel consumption drops 50-70%. Maintenance extends. Engine life increases. You keep the assets you already own and add the assets that pay back fastest.

How a Retrofit Works

Before: Diesel-Only

[DIESEL GEN] → [ATS] → [LOAD]

Diesel runs 24/7 at variable load. Inefficient at <40% load. Wears out from continuous runtime.

After: Hybrid System

[SOLAR] ↘
[BATTERY] → [HYBRID PCS] → [LOAD]
[DIESEL] ↗

Solar+battery carries daytime load. Diesel runs only when battery low or peak demand. Fuel cut 50-70%.

What We Add to Your Existing System

☀ Solar PV Array

Sized to provide 50-80% of your daytime load. Roof-mount, ground-mount, or carport — we work with your site.

Typical: 200kWp – 2MWp

🔋 Battery Storage

LiFePO₄ batteries sized for your night-time load. Smooths solar variability. Black-starts if diesel fails.

Typical: 500kWh – 4MWh

📊 Hybrid PCS

Bidirectional inverter. Manages solar+battery. Auto-starts diesel on low SoC. Synchs with your existing generator.

Typical: 100kW – 1MW

💻 EMS Software

Energy management system. Optimizes when to use solar, battery, and diesel. Reports savings. Remote monitoring.

Optional: cloud SCADA included

Real Retrofit Results

Saudi Arabia Industrial Site — 800kVA Existing Diesel

A water pumping station operated by a Saudi municipality had been running 3x 400kVA diesel generators in parallel for 8 years. The site was in excellent condition, but fuel costs at $0.30/L delivered and remote location made it expensive to operate.

Retrofitted with: 600kWp solar canopy + 1.2MWh battery + 500kW hybrid PCS. Existing diesel kept as backup.

Results after 18 months:

  • Fuel consumption: 220,000 L/month → 75,000 L/month (66% reduction)
  • Annual fuel cost saving: $522,000
  • Diesel runtime: 24 hr/day → 6 hr/day
  • Diesel service interval: 250 hr → 1,200 hr
  • Payback period: 2.6 years
  • Annual CO₂ reduction: 640 tons

Retrofit Project Process

A typical retrofit follows these steps over 12-20 weeks:

  1. Site survey (1-2 weeks): Load measurements, existing generator assessment, solar resource study, civil works review
  2. Engineering design (2-4 weeks): System sizing, single-line diagrams, equipment specifications, ROI model
  3. Manufacturing (4-8 weeks): Container fabrication, equipment integration, factory testing
  4. Logistics (2-6 weeks): Sea/air/road shipping to site, customs clearance, on-site delivery
  5. Installation (2-4 weeks): Container placement, cable connections, solar array mounting
  6. Commissioning (1-2 weeks): System testing, operator training, handover documentation
  7. Ongoing support: Remote monitoring, scheduled maintenance, performance reporting

Common Retrofit Challenges & Solutions

Every retrofit is unique, but most projects encounter a common set of challenges. Here’s how we address them:

  • Existing diesel age: Older generators may need refurbishment or replacement as part of the hybrid project. We assess and recommend the most cost-effective approach.
  • Available space: Solar arrays need land area (or roof area). We work with your site to find the best placement—ground, roof, or canopy.
  • Grid interconnection: If connecting to grid for export, the utility’s technical requirements must be met. We handle the application and approval process.
  • Permits and approvals: Local permits, environmental approvals, and grid operator sign-offs. Our team manages the documentation and submissions.
  • Financing: Hybrid retrofits qualify for green financing in many markets. We can connect you with lenders who specialize in energy efficiency projects.