Reference Designs
Engineering reference designs, system schematics, and technical documentation for hybrid microgrid and power distribution solutions.
System Architecture and Design Resources
Standardized reference architectures to accelerate your project planning and engineering.
Single-Line Diagrams
Standard SLD templates for hybrid microgrid configurations: solar+battery+diesel, solar+battery+grid, and full island-mode systems.
Container Layouts
20ft and 40ft containerized power station internal layouts. Equipment placement, cable routing, ventilation design, and access planning.
Switchgear Configurations
Standard LV and MV switchgear configurations for microgrid. Busbar ratings, breaker selection guides, and protection relay templates.
SCADA Architecture
Communication network topology for remote microgrid monitoring. PLC/RTU selection, protocol guidelines, and dashboard UI templates.
Battery Sizing Calculator
Reference methodology for sizing battery storage. Load profile analysis, autonomy days, depth of discharge limits, LFP vs lead-acid comparison.
Installation Guidelines
Site preparation, foundation requirements, cable trench design, grounding specifications, and commissioning checklists.
How We Support Your Design Process
๐ Custom Engineering Support
Our engineering team reviews your site conditions and load profile to recommend the optimal system architecture. We provide detailed single-line diagrams (SLD), equipment layout drawings, and cable schedules.
๐งช Pre-Shipment Testing
All systems undergo factory acceptance testing (FAT) before shipping. We simulate your actual load conditions and provide certified test reports including efficiency curves, thermal imaging, and harmonic analysis.
๐ On-Site Commissioning
Optional supervision and commissioning by our field engineers. We handle system integration testing, grid synchronization verification, and operator training at your location worldwide.
Frequently Asked Questions
Are these reference designs free to use?
Yes. All reference designs are provided as starting points for your project. We encourage you to adapt them to your specific site conditions and requirements.
Can you customize these designs for my project?
Absolutely. Send us your site data (location, load profile, available space, budget) and we will prepare a tailored reference design with BoM and cost estimate within 5 business days โ free of charge.
What software do you use for designs?
We use ETAP, AutoCAD Electrical, PVsyst, and HOMER Pro. Deliverables include DWG/DXF drawings, PDF reports, and Excel BoMs โ compatible with your engineering tools.
Reference Designs & Case Studies
A library of proven reference designs for common applications. Each design includes the full system architecture, equipment list, single-line diagram, and a real-world case study showing actual performance. Use these as starting points for your project.
Standard Reference Designs
RD-100: 100kW Telecom Hybrid
Single macro tower or small site. 50kWp solar + 200kWh battery + 100kVA diesel.
Containerized 20ft, plug-and-play
RD-500: 500kW Industrial Microgrid
Small factory, village, or facility. 300kWp solar + 1MWh battery + 500kVA diesel.
Containerized 40ft + outdoor PV
RD-2000: 2MW Mining Microgrid
Mid-size mine. 1.5MWp solar + 4MWh battery + 2x 1MW diesel.
Multi-container + outdoor MV step-up
RD-5000: 5MW Remote Microgrid
Large mine, resort complex, or village cluster. 4MWp solar + 10MWh battery + 3x 2MW diesel.
Multi-MW distributed architecture
RD-RESORT: Island Resort 800kW
200-villa resort. 500kWp solar + 2MWh battery + 800kVA diesel.
Containerized, C5-M marine coating
RD-OILGAS: Hazardous Area 1MW
Upstream well pad. 600kWp solar + 1.5MWh battery + 1MW diesel.
ATEX/IECEx Zone 2 certified
Featured Case Studies
Maldives โ 480kWp Solar Resort
2023 ยท 120-villa resort
Solar + 1.6MWh battery eliminated 78% of diesel use. Guest satisfaction scores improved significantly.
Payback: 3.8 years
Burkina Faso โ 1.2MW Gold Mine
2024 ยท 2,400m altitude
60% diesel reduction in first year. $310K/month fuel cost saving. 820 tons COโ abated annually.
Payback: 2.8 years
Southeast Asia โ 5,000 Telecom Sites
2022-2023 ยท nationwide rollout
5,000 ร 5kWp+30kWh standardized design. 99.99% uptime achieved. $24M annual OPEX saving.
Payback: 2.4 years
Saudi Arabia โ 800kVA Retrofit
2023 ยท water pumping
Solar canopy + 1.2MWh battery added to existing diesel. 66% fuel cut. Extended engine life.
Payback: 2.6 years
Request Detailed Design Package
Get the full single-line diagram, equipment list, performance simulations, and ROI analysis for any reference design.