CASE STUDIES

Our Projects

Explore Jinxing Power’s portfolio of completed hybrid microgrid and power distribution projects across Asia, Africa, and the Middle East.

Delivered. Commissioned. Operating.

Every project tells a story of reliable engineering. Here are some of our recent deployments around the world.

🇲🇴

Myanmar 500kW Solar-Diesel Hybrid

Complete hybrid microgrid for a telecom tower network: 500kWp solar + 800kWh battery + diesel backup. 62% fuel savings achieved.

🇵🇭

Philippines Island Resort Microgrid

Off-grid solar-battery-diesel system for a 120-room eco-resort. Silent nighttime operation with battery storage. ROI in 3.2 years.

🇳🇬

Nigeria Containerized Power Station

3 x 40ft containerized hybrid power stations for oil field operations. Each: 200kWp solar + 400kWh LFP battery + 300kVA diesel.

🇮🇩

Indonesia Mining Microgrid

Hybrid power for a remote gold mining site: 1MWp solar + 2MWh battery + existing diesel integration. 45% reduction in fuel logistics.

🇰🇪

Kenya Rural Electrification

50 village-scale solar-battery microgrids for off-grid communities. Pre-paid metering, remote monitoring, local maintenance training.

🉐🉊

Saudi Arabia Industrial Switchgear

Custom 11kV switchgear and 5 x 2500kVA transformer supply for a new manufacturing facility. Full type-testing and FAT witnessed by client.

Project Delivery Facts

What we have delivered and what it means for your project.

15+

Countries Served

50+

Completed Projects

15MW+

Solar PV Installed

25MWh+

Battery Deployed

What Our Clients Say

“The containerized hybrid system arrived exactly as promised — pre-wired, labeled, and tested. We connected it to our existing generators and were operational in 3 days. Diesel consumption dropped 58% in the first month.”

— Project Director, Southeast Asian Telecom Operator

“We evaluated 7 suppliers before choosing Jinxing Power. Their technical documentation, factory tour, and willingness to customize the design made the difference. The system has been running for 18 months with zero unplanned downtime.”

— Engineering Manager, West African Mining Company

“The switchgear and transformer package arrived on schedule, passed site acceptance on the first attempt, and has performed flawlessly. We have since placed two more orders.”

— Senior Electrical Engineer, Saudi Arabian EPC Contractor

Start Your Project With Us

Share your requirements and we will provide a detailed proposal with pricing, timeline, and performance projections.

Request a Proposal →

Featured Project Highlights

Three flagship installations that showcase our range — from equatorial island microgrids to high-altitude mining operations.

SOLAR HYBRID

Island Resort Microgrid, Maldives

A 480kWp solar + 1.6MWh LiFePO₄ battery system powering a 120-villa luxury resort. Result: 78% diesel reduction and near-silent nighttime operation that guests notice immediately.

  • Capacity: 480kWp solar + 1.6MWh battery
  • Annual fuel saving: $420,000
  • Payback: 3.8 years
MINING POWER

Remote Gold Mine, West Africa

Containerized 1MW hybrid system for an off-grid gold mine at 2,400m altitude. Designed for 55°C ambient and dust-heavy conditions. 60% fuel reduction despite 24/7 operation.

  • Capacity: 1MW solar + 4MWh battery + 2×1MVA diesel
  • Annual fuel saving: $1.2M
  • Annual CO₂ reduction: 3,400 tons
🔌
TELECOM NETWORK

5,000-Tower Network, Southeast Asia

Nationwide rollout of containerized solar-battery-diesel hybrid power systems for a Tier-1 telecom operator. Standardized 5kWp + 30kWh design delivered to 5,000 sites in 14 months.

  • Capacity: 5,000 × 5kWp solar + 30kWh battery sites
  • Uptime achieved: 99.99%
  • Diesel elimination: 85% (vs. diesel-only baseline)

Industries We Serve

Mining & Minerals

Remote site power for gold, copper, and lithium mines. Containerized solutions, hot-swap spare parts, dust-rated enclosures.

Oil & Gas

Hazardous-area certified equipment for upstream, midstream, and downstream operations. ATEX/IECEx compliant.

Telecommunications

Tower power for 4G/5G rollout in off-grid areas. Standardized solutions, remote monitoring, 99.99% SLA.

Islands & Resorts

Silent hybrid power for eco-resorts and island communities. Solar + battery primary, diesel backup for cloudy days.

Industrial & Manufacturing

Power distribution and motor control for factories. Power factor correction, harmonic filtering, peak shaving.

Construction & Camps

Temporary site power for construction camps and remote infrastructure projects. Fast deployment, easy relocation.

Our Delivery Process

From initial site assessment to commissioning, our proven 5-step process has delivered 200+ projects on time and on budget.

1

Site Assessment

Load data review, irradiation analysis, fuel cost study, regulatory check. 1-2 weeks.

2

Engineering Design

System sizing, equipment selection, single-line diagrams, ROI model. 2-4 weeks.

3

Manufacturing

Equipment production, factory testing, quality control. 4-8 weeks depending on scope.

4

Logistics & Site Prep

Containerized shipping, site civil works, foundation preparation. 2-6 weeks.

5

Commissioning & Handover

On-site installation, SCADA setup, operator training, 2-year warranty. 1-3 weeks.